A tenant improvement contractor is a licensed general contractor who turns a leased commercial space into one that works for your business. That means demolition, framing, mechanical, electrical and plumbing work, finishes, permits, inspections and a punch list, all managed under one contract. The right one knows your local permit office, builds to your lease's rules and hands you a space you can legally open. Below you will find what the work covers, how a build-out runs, who pays for what, and what to check before you sign.
TL;DR
- Tenant improvements (also called leasehold improvements or build-outs) are changes made to leased space to suit a specific tenant. The landlord, the tenant or both may pay.
- A good contractor handles design coordination, permits, construction, inspections and closeout, and works within your lease and your landlord's approval process.
- In Medford, commercial permit review averages six to eight weeks once everything is submitted, so build that into your opening date.
- Check the contractor's Oregon CCB license, bond and insurance, plus experience with spaces like yours, before you compare bids.
- Verity Construction builds offices, tenant improvements, retail spaces and multi-family projects across Medford and Southern Oregon.
Table of Contents
- What a tenant improvement contractor does
- How a commercial build-out runs, start to finish
- Who pays for what
- Code and accessibility: what can change your scope
- How to choose a tenant improvement contractor
- Questions to ask in the first meeting
- Build-outs with Verity Construction
- FAQ
- Sources
What a tenant improvement contractor does
Tenant improvements are the preparation of leased premises before or during a tenant's occupancy, and they may be paid for by the landlord, the tenant, or both. Investopedia notes that the same work is commonly called leasehold improvements, and that the changes are tailored to customize the space for a specific tenant.
A contractor turns that definition into a built space. On a typical project the scope includes:
- Demolition and layout changes. Removing old partitions, ceilings and flooring, then building new walls, offices, treatment rooms, stockrooms or a sales floor.
- Building systems. Adjusting HVAC, electrical, lighting, plumbing, data and fire protection to the new layout.
- Finishes. Flooring, ceilings, paint, millwork, counters, restrooms and breakrooms.
- Code and accessibility work. Exits, restrooms, ramps, door hardware and any upgrades the permit review requires.
- Coordination. Talking with your landlord, architect, engineers, inspectors and subcontractors so you deal with one accountable team.
The spaces vary. Offices, retail shops, clinics, restaurants and multi-tenant buildings all count. A shell space (bare walls, no ceiling or mechanical rough-in) needs a full build-out. A second-generation space may only need a refresh and a few new walls. The second is usually faster, but it can hide surprises behind the drywall, such as undersized electrical service or old ductwork that does not suit the new layout.
How a commercial build-out runs, start to finish
The order matters more than any single trade. Most delays come from a step started too late, not from slow carpentry.
1. Lease and landlord approval
Before you design anything, read the work letter or the alterations clause in your lease. It says what you may change, who must approve plans and which contractors the landlord accepts. Landlord rules can be strict. At one airport authority, for example, work done without written approval is subject to tenant charges or removal at the tenant's expense. Your lease may be gentler, but the principle holds: get approval in writing first.
2. Design and pricing
An architect or designer prepares plans. Bringing the contractor in at this stage pays off. A builder who prices the drawings as they develop can flag costly details early and propose alternatives before the plans are final. This is the idea behind design-build delivery, which is how our process is organized: planning and construction are coordinated from the start rather than handed off between strangers.
3. Permits
Tenant improvement permit review looks at more than the new walls. A Tacoma, Washington handout says it covers use, occupancy classification, type of construction, allowable area, accessibility, exiting and energy code. Clark County, Nevada asks for a code analysis of the existing shell building and the tenant space, including occupancy classification, occupant load, restrooms and exits. Rules differ by city and state, so the specifics for your project come from your local building department.
In Medford, the city's Building Safety Department says commercial permits average six to eight weeks from the time all required information is submitted. It also publishes commercial submittal guidelines, so a complete first submission is the best way to avoid extra rounds.

4. Pre-construction meeting
Once permits are in hand, get everyone in one room. One airport authority's rules, for instance, require a pre-construction meeting with the tenant, the contractors and the design team. Even where nobody requires it, the meeting is worth holding. Confirm the schedule, site access, work hours, deliveries, noise limits, how change orders are handled and who your day-to-day contact is.
5. Construction
A typical sequence is demolition, framing, then rough-in for mechanical, electrical and plumbing, followed by inspections, insulation and drywall, ceilings, flooring, millwork and fixtures, and last the finishes. Long-lead items such as storefront glass, specialty lighting, rooftop units and custom millwork should be ordered as soon as drawings allow. They often decide the real opening date.

6. Inspections, punch list and handover
Near completion, the local building department performs a final inspection. Passing it is what leads to a Certificate of Occupancy, and you generally cannot open to customers without one. After that comes a punch list walk-through where you and the contractor list small fixes, then closeout documents: warranties, as-built drawings and operation manuals.
Who pays for what
Cost is where tenants and landlords most often talk past each other. Three pieces of the puzzle matter.
The tenant improvement allowance. Many leases include one. As LEV's explainer describes it, an allowance is money the landlord provides to cover a portion of the construction costs of customizing the space. How it is paid out is a lease term. It might go to the contractor directly, reimburse you against invoices, or arrive as a lump sum. Ask your attorney or broker which applies to you, and confirm what happens if the work costs less than the allowance.
Permit costs and fees. On many projects these belong to the tenant and its contractor. One airport authority's guidelines state that permitting, development costs, fees and taxes are the tenant's and its contractor's responsibility. Your lease sets the rule for your space.
The build itself. Your contract price depends on the size of the space, its starting condition, the level of finish, the systems involved and the permit requirements. We do not publish a price for commercial work because every tenant space is different. If you want a number, the useful way to get one is a walk-through of the space and a review of your plans or program.
Landlord-managed versus tenant-managed work
In some leases the landlord runs the build-out and delivers a finished space. In others, you hire the contractor. When the choice is yours, ask what you gain from controlling the schedule, the contractor and the finishes. Tenants who control the build generally have more say over quality and sequencing. They also carry the coordination, so a contractor who communicates well matters even more.
Code and accessibility: what can change your scope
Two items repeatedly turn a simple-looking project into a bigger one.
Occupancy and exiting. If your use is different from the space's previous use, the plan reviewer will look at occupant load, exit widths and travel distances, restroom counts and sometimes fire protection. Covington, Washington's drawing checklist shows the level of detail expected, with occupant-load information at exit doors and exits and door swings marked on the plans.
Accessibility. The same checklist requires floor plans to show accessibility compliance under the state code. Tacoma's handout lists ADA parking and ramps among the items reviewed. In practice that can mean door clearances, restroom layouts, counter heights, a route from the parking area to the entrance, and signage. Ask your design team early whether your project triggers upgrades outside the lease space, because those costs belong in the budget from day one.
These examples come from other jurisdictions. In Oregon, the controlling requirements are the state building codes as applied by your city or county, so your contractor and architect should confirm them with the Medford Building Safety Department or the building official where your property sits.
How to choose a tenant improvement contractor
Google's results for this topic are full of contractors in Los Angeles, Seattle and the Bay Area, and their pages share the same promise: turnkey service with permits handled. That is a useful baseline. Here is how to tell one contractor from another once you have a shortlist.
Check the license, bond and insurance
Oregon law generally requires anyone who does construction work on real property for pay to be licensed by the Construction Contractors Board. Ask for the license number and look it up on the CCB site. Also ask for a certificate of insurance and confirm the bond. Verity Construction is a licensed, bonded and insured local team, and we are glad to provide those details at the start of any conversation.
Look for relevant, local experience
A contractor who builds large warehouses may not be the best choice for a 2,000-square-foot dental suite, and the reverse is also true. Ask to see projects close to your size, use and building type. Local experience also means they know the permit office, the inspectors and the subcontractors who show up. You can see one example of our commercial work in this Southern Oregon office renovation with a modern breakroom.
Ask how the project will be communicated
Tenant projects run on tight schedules and often on rent that has already started. Ask who your main contact is, how often you will get updates, how change orders are priced and approved, and how schedule changes are reported. Direct communication and transparent project updates are central to how we work, and they are worth asking any contractor about.
Compare bids on the same scope
Three bids can differ by a lot simply because they include different things. Line them up on the points below.
| Item to compare | What to confirm |
|---|---|
| Scope of work | Which walls, finishes, fixtures and systems are included |
| Permits and fees | Who prepares, submits and pays for them |
| Design | Whether architectural and engineering coordination is included |
| Allowances | Which items are placeholders, and the amounts |
| Exclusions | Furniture, equipment, signage, data and anything the landlord supplies |
| Schedule | Start, major milestones, lead times and the target completion |
| Change orders | How they are priced, documented and approved |
| Closeout | Punch list, warranty and as-built documents |
Match the contractor to your lease deadlines
Work backward from the date you must open, or the date your free-rent period ends. Add permit review time, lead times for long-lead materials and room for inspections. A contractor who gives you a realistic schedule with its dependencies is more valuable than one who promises the shortest one.
Questions to ask in the first meeting
- Which parts of the scope do you self-perform, and which do you subcontract?
- Have you built in this building or with this landlord before?
- Who will be on site every day, and who do I call with a question?
- What can you tell me about the permit path for my use in this city?
- Which materials or equipment have long lead times for this design?
- How do you handle hidden conditions found after demolition?
- What does the closeout package include?
A contractor who answers these in specifics, using your space and your lease, is showing how they will run your job.
Build-outs with Verity Construction
We build for business owners, developers and property managers in Medford and across Southern Oregon. Our commercial work includes professional offices, tenant improvements, retail stores and multi-family development, delivered by a licensed, bonded and insured local team.
We start with your space, your lease and your timeline, then plan the work with you through design, permitting, construction and final walkthrough. You can read about the services on our commercial builder page.

If you have a space under lease or about to be, send us the address and a description of how you plan to use it. We will talk through the scope, the permit path and the schedule with you.
FAQ
What does "tenant improvements" mean?
Tenant improvements are changes to a leased commercial space to make it suitable for a particular tenant. They can include new walls, flooring, ceilings, lighting, restrooms and mechanical work. They are also called leasehold improvements, and the landlord, the tenant or both may pay for them.
Is a tenant build-out the same as a tenant improvement?
In everyday use, yes. A build-out usually refers to finishing a bare or partly finished space from the ground up, while tenant improvement can also cover smaller changes to a space that is already built. Contractors and brokers use the two terms interchangeably, so check the scope in your lease to be sure.
Who pulls the permit for a tenant improvement?
That depends on your lease and your contract. In a tenant-managed build-out, the tenant's contractor typically prepares and submits the permit application with the design team. In a landlord-managed turnkey arrangement, the landlord handles permits. Confirm this in writing before work begins, along with who pays the fees.
How long does a commercial tenant improvement take?
It depends on the size of the space, the amount of design work, the permit review and the lead times for materials. Permit review alone in Medford averages six to eight weeks for commercial projects once everything is submitted. Your contractor can give you a schedule once they have seen the space and the plans.
Do I need a licensed contractor for tenant improvements in Oregon?
Generally, yes. Oregon requires a Construction Contractors Board license for most construction work on real property done for pay. Ask your contractor for the license number and verify it with the CCB before you sign.
Sources
- Global Definitions Database, INREV
- Leasehold Improvement: Definition, Accounting, and Examples, Investopedia
- What Are Tenant Improvements in Commercial Real Estate? LEV
- Tenant Improvement Guidelines, Salt Lake City Department of Airports
- Tenant Improvements for Commercial Buildings Building Permit Guide, Clark County, Nevada
- Tenant Improvements (TI), City of Tacoma
- Tenant Improvement Minimum Drawing Checklist, City of Covington
- How To Apply For a Building Permit, City of Medford
- CCB License, Oregon Construction Contractors Board